Dr. Fred Fischer

Dr. Fred Fischer

There is approx. 30,000 SF of SIPS on the roof of the Von Speigel Street Baptist Church in Louisville, KY. The project is presently under construction (10/27/03) and should be wrapping up the roof in the next 7-10 days.

This is a steel structure. As the photo below indicates, 2x blocking was fastened to the steel. The SIP panels are being screwed into the blocking using 8" & 9" Panel Screws by Olympic (12" o/c). The panels are being cut on site with a Prazi blade which attaches to a circular or worm drive saw. The panels are being lifted by strapping that has been attached using lift plates screwed into the top OSB skin (provided by FischerSIPS). All panels are connected on each side with a single 2x6 spline that has been caulked & nailed in place.

Click on an image to see a larger version

thumbnail thumbnail thumbnail
thumbnail thumbnail thumbnail